Business Overview

A leading and fully integrated CBM company

Upstream

  • 100% participation in Raniganj (South) block, West Bengal:
    • 210 sq. km, 10.62 TCF estimated Original-Gas-in-Place
    • 156 wells drilled
    • A further 144 wells planned to be drilled
    • 56 deviated wells have been successfully drilled
  • 100% participation in Mannargudi block, Tamil Nadu:
    • Environment clearance received
    • The block is currently under Arbitration with the Government

Midstream - Raniganj (South) block

  • Gas Gathering Station and related infrastructure all fully operational
  • Dedicated pipeline running through the heart of Asansol-Durgapur industrial belt
  • Supplying to industrial clients

Downstream - Raniganj (South) block

  • Located at the heart of West Bengal's large and growing industrial centre
  • Multiple contracts with a range of large and medium industrial clients